Burley
Tilt-Up Addition
We constructed a 12,800-square-foot tilt-up addition to provide necessary storage space to support the growth of a local leader in child bicycle trailers, strollers and accessories. We also upgraded the fire sprinkler system to the entire warehouse space.
This project was done as a design-build delivery system. This is a collaborative approach between us as the general contractor, the owner and designer, with us retaining the design team and being the single point of contact for all design and construction. This approach reduced the delivery schedule by overlapping the design and construction phase, which streamlined the process while saving time and money for the project owner.
Project Details:
Client: Burley
Location: Eugene, OR
Design Build Team: McKenzie Commercial & Ford & Associates
Size: 12,800 sq. ft.
Cost: $1.3 million
Completion: October 2015